projects
Stone Crossing Footbridge
BCS has been assigned by Costain to develop a design for the Stone Crossing Footbridge which will allow for a safer pedestrian access across the tracks.
West Ealing Depot
BCS has been commissioned to co-ordinate and complete the GRIP 4 surveys and GRIP 5 detailed design for the West Ealing Sidings project. The project involves the construction of a new stabling depot complete...
Crossrail Anglia Scheme Structural Assessments
BCS Design has been commissioned by Costain to be a part of the Crossrail Anglia Scheme for Network Rail. The Crossrail Project is among the most significant infrastructure projects ever undertaken in the UK.
Horsham Field Depot
The new-build £13m Horsham Field Sidings is part of the Thameslink Programme, a £6.5bn government-sponsored project that includes the transformation of north-south travel through central London.
Structure Strengthening
BCS Design Ltd has been appointed by ABC Electrification Ltd to validate 24 existing OLE supporting masts on the West Coast Mainline. The scope included verifying the mast behaviour due to additional ATF loading...
Roberts Road Bridge
The Roberts Road Bridge project is part of the Great Western electrification project from Network Rail, which includes work to the South Wales mainline – an important rail route linking major towns and cities...
Overbridge 37
Description: Preliminary Assessment Design of Protection Method Site Survey Temporary Works Design
Poole to Wool Resignalling
Description - Resignalling scheme to 26 miles of operational railway Civils design of new foundations, superstructures and route works CRE services and site support Level crossing and ground plan design
Crossrail
Description: Design of propped sheet pile retaining wall to facilitate new cross rail portals Portal 160m long x 15m span x 6m deep Design of robust barrier Integration of design with adjacent Docklands...
Thameslink Outer Areas
Description: Platform extensions to existing operational station to facilitate 12 car trains as part of Thameslink Programme. Design to Platforms 1 to 4 using cross walls and wide span decking
Brighton Stabling Sidings
Description An award winning flagship project for BCS, the multi-disciplinary design of a train car stabling, CET cleaning and train wash facility, as part of the Thameslink Programme. Delivered...
Power Supply Upgrades
Description: New transformers and switchgear to existing AC Substations at 7 sites Civils design of new foundations and route works Temporary works to facilitate installation of new internal equipment