Brighton Stabling Sidings
Location Project Date Client
Brighton NR Depot January 2013 Carillion
Description

An award winning flagship project for BCS, the multi-disciplinary design of a train car stabling, CET cleaning and train wash facility, as part of the Thameslink Programme.
Delivered collaboratively on time and within budget
Key Project Features

New 3 car stabling facility in redundant siding
Integration with existing infrastructure and services
New Carriage Wash and CET Facilities
Working in close proximity to existing open lines
New Accommodation and offices
Sustainable Low Energy Lighting solutions value engineered into the scheme
Design Services Provided

Topographical Surveys
Ground Investigation
Multi-Disciplinary Detailed Design
Civils
Permanent Way
HV
DC/ETE
Comms
CCTV
M & E
Architectural
Benefits, Environmental & Sustainability

Environmental & Habitat Assessments Undertake
Award Winning Low Energy LED Lighting Solutions
Energy efficient carriage wash and CET Facilities
Reduced material off site due to cut/fill optimisation
Reduced drainage costs using existing ground as soak away
Staged design delivery to meet early possession dates.