Power Supply Upgrades
Project
Project
Project
Project
Project
Project
Power Supply Upgrades
Location Project Date Client
Watford to Euston Substations January 2013 HVMS
Description:

New transformers and switchgear to existing AC Substations at 7 sites
Civils design of new foundations and route works
Temporary works to facilitate installation of new internal equipment
Key Project Features:

New equipment required complex temporary works to facilitate installation.
Works were in close proximity to live rail traffic
Detailed interaction with electrical designer to ensure integrated design.
Design to Network rail Standards
Design Services Provided:

Topographical Surveys
Civils design of new foundations , route works and building modifications
Temporary works design of building modifications and crane lifts
Interfacing with HV disciplines
Benefits, Environmental & Sustainability:

Environmental Assessments Undertaken
Works designed to minimise impact on operational railway
Material selections and methodology recognised difficult access