Location Project Date Client
Stoke November 2015 Network Rail
Description:

Preliminary Assessment
Design of Protection Method
Site Survey
Temporary Works Design
Key Project Features:

Develop protection methods for the overbridge located near the vicinity of proposed Autotransformer Conductor (25kV) as part of the West Coast Power Supply Upgrade Project
Preliminary assessment of feasibility to provide a screen solution on the overbridge ensuring a cost-effective design process, highlighting potential problems and establishing a number of possible options that provide compliant screening solutions
Structural design of steel mesh screen according to standards
Site support
Provide a temporary solution using scaffolding while permanent structure is being fabricated, in order to ensure public safety
Design Services Provided:

Site survey
Design of steelwork structure and connections
CRE services
Interfacing with signalling and power supply disciplines
Temporary works design
Benefits, Environmental & Sustainability:

Works designed to minimise impact on operational railway
Material selections according to suitable standards