Poole to Wool Resignalling
Location Project Date Client
Poole July 2013 BCM / SSL
Description:

Resignalling scheme to 26 miles of operational railway
Civils design of new foundations, superstructures and route works
CRE services and site support
Level crossing and ground plan design
Key Project Features:

25 miles of route surveys
Over 150 individual structures designed
Level crossing design/renewals
Site support
Design Services Provided:

Topographical surveys
Intrusive ground investigation
Civils design of new routes
Civils design of new REBs, LOCs, signal foundations, PSPs
Signal superstructure and gantry design
CRE services
Interfacing with signalling and power supply disciplines
Level crossing ground plans and design
Benefits, Environmental & Sustainability:

Environmental assessments undertaken
Works designed to minimise impact on operational railway
Material selections and methodology recognised difficult access
Innovative precast signal foundation design